Eastern Asia

Eastern Asia: Our main Clients

Scope of supply Name of projects Year Client Location
No 1 Thermophysical Deaerator
Q = 156 T/h
Chengxi Waste Incinerator Plant ’24 reserved TAIWAN
No 1 Thermophysical Deaerator
Q = 128 T/h
Hsinchu County Renewable Project ’23 WORFIN TAIWAN
No 1 Thermophysical Deaerator
Q = 105.2 T/h
TCE Project ’22 FORMOSA TAIWAN
No 1 Thermophysical Deaerator
Q = 70 T/h
FU-TAI ENGINEERING PROJECT ’22 WORFIN TAIWAN
No 1 Thermophysical Deaerator
Q = 65 T/h
FU-TAI ENGINEERING PROJECT ’22 WORFIN TAIWAN
No 1 Thermophysical Deaerator
Q = 84 T/h
FORMOSA PROJECT ’20 WORFIN TAIWAN
No 1 Thermophysical Deaerator
Q = 733 T/h – HEI standard
PTA-6 PROJECT ’20 FORMOSA ROC (Republic of China)
No 1 Thermophysical Deaerator
Q = 60 T/h – HEI standard
NING-BO PROJECT ’19 FORMOSA ROC (Republic of China)
No 1 Thermophysical Deaerator
Q = 140 T/h – HEI standard
PIA PROJECT ’19 FORMOSA ROC (Republic of China)
No 1 Thermophysical Deaerator
Q = 394 T/h – HEI standard
JP3 Project ’18 FORMOSA TAIWAN
No 1 Thermophysical Deaerator
Q = 586T/h – HEI standard
NING-BO Project ’16 FORMOSA ROC (Republic of China)
No 1 Thermophysical Deaerator
Q = 15T/h
TAIWAN POWER PLANT ’16 WORFIN TAIWAN
No 2 Thermophysical Deaerators
Q = 510.5T/h each – HEI standard
ASC POWER PLANT PROJECT ’16 FORMOSA TAIWAN
No 3 Thermophysical Deaerators
Q = 534T/h each – HEI standard
END PLATE HP #1-3 PROJECT ’15 FORMOSA TAIWAN
No 1 Thermophysical Deaerator
Q = 7.8 T/h
HEI standard
CPC TALIN PROJECT ’10 CTCI TAIWAN
Thermophysical Deaerator
Q=500 T/h – HEI standard
Aroma 3 – Mai Liao Plant ’05 FORMOSA CHEMICALS TAIWAN
Thermophysical Deaerator
Q=45.6T/h – HEI standard
Mailao Plant ’04 FORMOSA PLASTICS TAIWAN
Thermophysical Deaerator
Q = 37 T/h – HEI standard
Mailao Plant ’03 FORMOSA CHEMICALS TAIWAN
Thermophysical Deaerator
Q = 130 T/h
CNTIC anton Plant ’96 TECNIMONT CHINA